1. The survey and quote
We come out, measure up and look at the levels, drainage, access and anything under the ground like drains or cables. We talk through the surfaces that would suit (block paving, resin, tarmac or imprinted concrete), bring samples, and explain whether you need a dropped kerb or any permission. You then get a written quote. We don’t take a deposit.
2. Digging out
On the first day, the old surface and soil are dug out to the right depth for the new driveway. This is the noisiest, messiest part. Spoil goes into a skip or a grab lorry. If we find anything unexpected, like an old soakaway or a broken drain, we’ll talk to you before going further.
3. The sub-base and edging
The base is what makes a driveway last. A layer of crushed stone is laid and compacted in stages to create a solid foundation, and the edges are set in concrete to hold everything in place. Drainage channels or soakaways go in now too.
4. Laying the surface
- Block paving: laid on a sharp sand bed, cut at the edges, compacted, then jointed with kiln-dried sand.
- Resin bound: mixed on site and trowelled by hand to a smooth finish, then left to cure.
- Tarmac: laid hot, levelled and rolled for a firm, even finish.
- Imprinted concrete: poured, coloured, imprinted with the pattern, then cleaned and sealed once cured.
5. Clean-up and handover
We clean the site, walk round the finished driveway with you, and explain how to look after it. You only pay once you’re happy.
How long will it take?
It depends on the size, the surface and the weather. Smaller tarmac and resin drives can be done in a few days, while larger block paving and imprinted concrete driveways usually take one to two weeks. We give you a timescale with the quote.
When can I drive on it?
Block paving can usually be used once it’s compacted and jointed. Resin and imprinted concrete need time to cure, and tarmac needs to cool and harden. We’ll tell you exactly when it’s ready.
How to get ready
- Arrange somewhere else to park for the duration.
- Move bins, pots and anything stored on the drive.
- Let your neighbours know there’ll be a skip and some noise.
- Make sure we can access an outside tap and power, or let us know if not.
- If you need a dropped kerb, get the council application in early. See our dropped kerb guide.