Skip to content
Marshalls approved installer 20+ years laying driveways 5-year guarantee
info@md-driveways.co.uk
MD Driveways Ltd
MD Driveways Ltd
07392 043 112 Free quote

Driveway advice

What to expect when your new driveway is being laid

From the free survey to the final walk-round, here’s what happens at each stage of a new driveway, how long it takes and how to get ready.

By Matthew Daly, MD DrivewaysUpdated 12 November 20262 min read

Short answerA new driveway goes through five stages: survey and quote, digging out, building the sub-base and edging, laying the surface, then cleaning up and a final check. Most driveways take from a few days to a couple of weeks. You’ll need to park elsewhere while the work is going on.

1. The survey and quote

We come out, measure up and look at the levels, drainage, access and anything under the ground like drains or cables. We talk through the surfaces that would suit (block paving, resin, tarmac or imprinted concrete), bring samples, and explain whether you need a dropped kerb or any permission. You then get a written quote. We don’t take a deposit.

2. Digging out

On the first day, the old surface and soil are dug out to the right depth for the new driveway. This is the noisiest, messiest part. Spoil goes into a skip or a grab lorry. If we find anything unexpected, like an old soakaway or a broken drain, we’ll talk to you before going further.

3. The sub-base and edging

The base is what makes a driveway last. A layer of crushed stone is laid and compacted in stages to create a solid foundation, and the edges are set in concrete to hold everything in place. Drainage channels or soakaways go in now too.

4. Laying the surface

  • Block paving: laid on a sharp sand bed, cut at the edges, compacted, then jointed with kiln-dried sand.
  • Resin bound: mixed on site and trowelled by hand to a smooth finish, then left to cure.
  • Tarmac: laid hot, levelled and rolled for a firm, even finish.
  • Imprinted concrete: poured, coloured, imprinted with the pattern, then cleaned and sealed once cured.

5. Clean-up and handover

We clean the site, walk round the finished driveway with you, and explain how to look after it. You only pay once you’re happy.

How long will it take?

It depends on the size, the surface and the weather. Smaller tarmac and resin drives can be done in a few days, while larger block paving and imprinted concrete driveways usually take one to two weeks. We give you a timescale with the quote.

When can I drive on it?

Block paving can usually be used once it’s compacted and jointed. Resin and imprinted concrete need time to cure, and tarmac needs to cool and harden. We’ll tell you exactly when it’s ready.

How to get ready

  • Arrange somewhere else to park for the duration.
  • Move bins, pots and anything stored on the drive.
  • Let your neighbours know there’ll be a skip and some noise.
  • Make sure we can access an outside tap and power, or let us know if not.
  • If you need a dropped kerb, get the council application in early. See our dropped kerb guide.

Recent work

Some of our recent work

All projects
Red block paving with a diamond feature

Red block paving with a diamond feature

Block paved driveway with stone steps

Block paved driveway with stone steps

Brindle block paved driveway

Brindle block paved driveway

Grey block paved driveway with curved borders

Grey block paved driveway with curved borders

Grey herringbone driveway with a charcoal border

Grey herringbone driveway with a charcoal border

Thinking about a new driveway?

Surveys and quotes are free. Send your details, ring the office or WhatsApp us a few photos.

Get a free quote 07392 043 112
Call Free quote